How long does it take to remove and replace an electric panel with a new one? | | 1-2 hrs | 2% | | 2-3hrs | 7% | | 3-4 hrs | 17% | | 4-5 hrs | 26% | | 5-6 hrs | 9% | | 6-7 hrs | 9% | | 7-8 hrs | 19% | | Unsure | 7% | | | | | Question: How long does it take to remove and replace an electric panel with a new one? Top Answer (26% of 41 votes): 4-5 hrs.
Answer: 7-8 hrs Explanation: For a straightforward residential panel replacement, the physical removal and installation typically takes about 4–8 hours. | | EDLab LLC | Answer: 6-7 hrs Explanation: A full panel removal and replacement—same location, same service size, using existing wiring—typically lands in the 6–7 hour range. It’s a detailed, safety-critical process that involves far more than just swapping a metal box.
Why it takes 6–7 hours:
Utility disconnect and reconnect: SMUD or PG&E must shut off power at the service drop and return later to re-energize.
Removing the old panel: Circuits must be safely labeled, disconnected, and pulled out without damaging existing wiring.
Installing and mounting the new panel: The new enclosure must be leveled, secured, and aligned with existing conduit or service entry.
Transferring all branch circuits: Each circuit is trimmed, landed, torqued to spec, and organized to meet code.
Upgrading grounding and bonding: Most older homes need updated grounding electrodes, bonding jumpers, or water-pipe bonding.
Inspection and testing: The installation must pass city or county inspection before the utility reconnects power.
When it takes longer (7–8+ hours):
Damaged or short wiring that needs extension
Service mast or meter issues
Corroded grounding system
Tight or inaccessible panel locations
Multiple subpanels or add-ons
When it can be slightly faster (5–6 hours)
Clean, modern wiring
Straightforward like-for-like replacement
Easy exterior access
Summary
A professional panel replacement is a full-day job, with most landing in the 6–7 hour window once utility coordination, grounding upgrades, circuit transfers, and inspection are factored in. | | EcoWise Electric LLC | Answer: 5-6 hrs Explanation: Depends on the existing installation and the number of circuits. | | G & H Electrical Services, LLC | | | ProMatcher | Answer: 7-8 hrs Explanation: After swapping out the old panel with the new one, you've got to have the utility company turn the power back on, test all the circuits and breakers, and than have the building inspector sign off and close out the permit. | | Advanced Energy Services, Inc. | Answer: Unsure Explanation: Very much depends | | Aegis Electric LLC | Answer: 7-8 hrs Explanation: depends on amount of circuits in panel | | Electrical Services Inc. | | | ProMatcher | Answer: Unsure Explanation: Depends on the existing wiring | | My Electrician | Answer: 4-5 hrs Explanation: You must make sure you have all the wiring in order and seperate the 220 volt circuits or you could blow up an appliance or your new 65" TV. Experience is key. I usually tell people their ice wont melt before I'm done | | Advanced Electrical and Energy | Answer: 4-5 hrs Explanation: When replacing a panel you will have to relabel all your circuits, and check every device in home to ensure proper operation. | | Seabreeze Electric | | | ProMatcher | Answer: Unsure Explanation: Are we just swapping old for new or an upgrade, another factor what size service and how many existing cables | | Jove Electric | Answer: 6-7 hrs Explanation: It depends on how many circuits were added over the years, inspections, and the utility power company. | | LED Electrical Services |
|